Legal
Keeping BIM on the right side of the law
The adoption of multi-party BIM models will need careful legal underpinning. CM asked law firms Brodies and Fenwick Elliott for their views
Does sharing data mean sharing liability?
BIM carries on where three-dimensional CAD leaves off, adding fourth and fifth dimensions (commonly viewed as cost and time) and the prospect of further dimensions in the future.
Due to a lack of computing power and the software currently available, full implementation of BIM, including the integration of architectural, engineering, services and contractor information into one mutually accessible model is still several years away for most of us.
But on the grounds that it’s never too soon to be prepared, it’s worth flagging up two sets of legal issues that contractors and consultants need to think through: intellectual property rights and professional indemnity issues.
At present, the treatment of design models created separately by architectural and engineering teams is no different to that of the less complicated 2D models and plans. Each of the common suites of appointment documentation from the RIAS or RIBA, the ACE or the NEC contracts, provide for a licence for the employer to use the information under the contract, with the consultant retaining ultimate ownership.
Collaboration conundrum
But things will become more complicated when the different designers’, consultants’ and contractors’ input goes to create one single model. In a collaborative work, UK intellectual property law generally holds that separate copyrights will exist if the work contributed by each person or parties is distinct.
The advent of BIM and the storage of all project information in a single, continuously updated model, means that an individual collaborator’s intellectual property is far more accessible to other collaborators. It could even result in all of the collaborators holding joint copyright in the model, making further exploitation difficult because each holder of the joint copyright would have to agree to any proposed licence or assignation.
Confidentiality may also be compromised. For example, BIM could lead to the misuse or reuse of a collaborator’s contribution without proper compensation, or inadvertent sharing of proprietary information, manufacturing process data or patented processes.
At present, the industry’s standard appointment forms do not deal with such situations, so collaborators will have to document the intellectual property arrangements on a case-by-case basis. Questions will include:
l Should all parties each own the copyright in their individual contributions?
l Do mutual obligations of confidentiality need to be augmented?
l Should one party own the copyright to the BIM? If so, do other parties need to be granted rights to work on the BIM, and should these rights be limited to the specific project only?
If these kinds of issues are dealt with in a co-ordinated suite of contracts for a project, BIM can be harnessed to ensure all contributions to a collaborative work are distinct and protected from the contributions of the other parties.
Whose fault is it anyway?
At present, if there is a mistake in an architectural detail then the employer looks to the architect. If a structural element is undersized or defective, the employer looks to the engineer. If, however, there is a defect in a model which is a collaborative work, is it the design team as a whole or one member of it who would be responsible?
Arguably the designer responsible for the defect should probably bear most, if not all liability. Nevertheless, there is a possibility of joint and several liability for all unless this is carefully excluded by the terms of the collaborators’ appointments.
While professional indemnity insurers will normally assist, it is not unheard of for consultancies to cease trading without run-off insurance cover. Some might have significant excesses on their policies or allow their insurance position to slip.
At present, it appears that BIM does not give rise to any legal issues not already seen with 2D or 3D CAD. However, when main contractors, sub-contractors and consultants contribute to one model, clients and everyone in the supply chain will have to look again at contracts and appointment documents, clarifying intellectual property rights and liability.
Alisdair Matheson is a construction lawyer and John McGonagle a technology lawyer at Brodies.
Will confidentiality mean encoding BIM data?
BIM is the construction industry’s buzzword. If you want to secure that next project or market your company as a leader in innovative, efficient design, you would be well advised to include the acronym at the front of your marketing strategy or bid submission.
Clients are increasingly requesting evidence of BIM from contractors and consultants, and the government’s chief construction adviser, Paul Morrell, has said that it may become mandatory on publicly procured projects.
The first step in tackling any legal issue is to understand how the project is going to use which aspects of BIM. This needs to occur right from the outset, so that any appointment documents and/or building contracts can take BIM into account. Indeed, matters such as insurance cannot be addressed unless this is known and co-ordinated from the start.
Many of the legal issues associated with BIM are concerned with intellectual property (IP) rights and copyright. BIM is often not simply one 3D model which many consultants and subcontractors contribute to — it’s more likely to comprise several models, each created by different consultants. All models are then referenced and co-ordinated to create the whole picture.
If this is the case, then who owns the model and the IP rights contained within it? In short, where there is more than one model, ownership may rest with more than one party.
Traditionally, when constructing with 2D drawings on paper, the general position, unless otherwise agreed, is that the designer retains the IP rights of the design and the employer has license to use that design for the construction of the project. With BIM, the position is no different. Unless otherwise agreed, each designer or manufacturer owns the intellectual property rights in their own 3D model.
So, in some respects, provided that any issues are appropriately incorporated into the appointment documents, IP rights should not be a major stumbling block to using BIM.
Sense and sensitivity
Confidential information, however, may prove to be a more sensitive issue for some consultants or suppliers. Trade secrets and confidential details necessary for the manufacture of certain components will need to be incorporated into the suppliers’ BIM models. Some may feel uncomfortable with the release of this information for use in other consultants’ models, particularly as the ease of data transfer offered by today’s technology increases the likelihood of third party access.
Confidentiality clauses can be incorporated into appointments and building contracts, or a project-wide confidentiality agreement can be signed by all parties. However, on a more practical level, parties must consider how and to what extent each consultant is going to use the other’s model. Is it essential that all manufacturing and material information is embedded in the model provided to the architect? Depending on the extent to which BIM is used, could symbols or labels be used on the model until the time for fabrication arrives, when the confidential manufacturing information can then be inserted?
Given the current software and technologies available, BIM is not yet a seamless process from design through to manufacture. A two-step process is still often implemented to translate or extract data necessary for the final manufacturing process, particularly when BIM has not been fully considered from the start of the project.
The key to BIM is not in the details of the legal issues, but in the close collaboration of all designers, engineers, contractors and suppliers, a a fundamentally new mindset for the industry. However, if the advantages and efficiencies of BIM are to be maximised, this shift is imperative.
Stacy Sinclair is a US-trained architect and a trainee solicitor at Fenwick Elliott.
What’s on your iPhone?
Bernard Keogh MCIOB, managing director, Arque Construction
Quick Guide to Construction Claims by Madhav Nadarajan (ebook)
Available from Apple App Store, £2.39
If this had been a conventional book, I wouldn’t have read it! But with an iPhone, if you’ve got a spare few minutes waiting for a meeting, you might as well.
The book is really international rather than UK-focused, but it covers general principles applicable to all contracts, including JCT. In fact, I was surprised how relevant and informative it was.
There is an interesting section on ‘cause and effect’. When contractors are submitting claims and variations, they tend to roll everything up together. But the book makes the point that it is better to treat each issue separately, leading to a more robust claim.
I often go to legal seminars and would say that I know the basics. But in the heat of a situation, you can suffer from ‘selective memory syndrome’. Having the ebook puts the issues front of mind. It helps top up your knowledge and keep you plugged in.
John Eynon MCIOB, proposals manager, Wates Construction
Site Pad by Fresh Design Base
Available from www.sitepad.co.uk, £5.99
Although I’m not really a CAD monkey, I can see that this tool would be useful.
It gives you a library of CAD elements and basic design tools from which you can create drawings or diagrams.
As a site architect — a job I used to do — at the moment you might do a sketch of a problem on site, take a photo of it and email it back to the office. In my generation, I drew the problem on graph paper, then faxed it!
But with this app, you can do a sketch on your iPhone, share it with your colleagues, and discuss it in real time — you get the answer or resolve an issue straight away.
It’s a challenge to sketch on an iPhone screen, it would work much better on an iPad. But I do think the idea’s got potential.
It costs £5.99, which is reasonable, but then I realised you have to set up an account to get access to the user guide. For £6, I would expect that to be included.
Zumtobel’s Map of Light
Available from the Apple App Store, free
This is the way things will go in the future, as a means of receiving information about products or suppliers then carrying it around with you. But it’s still in the early stages, and companies are on a learning curve.
The app is a version of an online database of 500 lighting installations worldwide, as well as information on the product range. There’s a function called “around me”, which call up the nearest projects in the vicinity, or you can send pdf files straight from the app.
“The idea is good, but there isn’t enough hard information there — for instance on sustainability ratings or energy efficiency — to make it useful to someone making specification choices. Nice images aren’t enough to decide to use a fitting or not.
Leave a comment
Construction Pro
Peter Stockill’s Case notes
Sweett (UK) (formerly Cyril Sweett) v Michael Wight Homes CC, February 2012 If you agree to arrange for a contract to be put in place between two other parties, are ...
» Read full articleWho wants to be a director?
To be on the board of a company has its attractions, but it also carries a wide range of legal responsibilities, says Christopher Burgon Whether you are at the apex ...
» Read full articleFive ways to… manage an age-diverse workforce
Five ways to... manage an age-diverse workforce 01 Address the myths Stereotypical thinking about age and what people can or can’t do influences the way people at work are managed ...
» Read full articleTips of the Trade
Energy-harvesting wireless sensor networks 01 Understand the basics Energy-harvesting wireless sensors use micro-energy convertors — in the form of motion converters, solar cells or temperature convertors — to power sensors, ...
» Read full article
Why we specified...
Ecodan CAHV monobloc air source heat pump boilers from Mitsubishi Electric Spring Gardens, Lewisham Simon Moses, asset manager, St Mungo’s Housing Association We’d received funding from the Homes and Community ...
» Read full article
Have you thought of…
...working on a $100bn metropolis built on a series of artificial islands? Forget Palm Island, it’s so last decade. The latest artificial island for Premiership football players to grab a ...
» Read full articleStephen Clarke’s Case notes: April 2012
Stephen Clarke’s Case notes Ms S Jones and Ms R Lovegrove v Mr L Ruth and Mrs K Ruth Court of Appeal 12 July 2011 Ms Jones and Ms Lovegrove ...
» Read full article (1 comment)Salary exchange schemes can bring all-round benefits
Salary exchange schemes can bring all-round benefits The NIC exemption for holiday pay schemes is being removed. But there’s other options to structure pay tax efficiently, says Anil Patel The ...
» Read full articleTips of the Trade: Working with concrete reinforcement
Working with concrete reinforcement 01 Make the right choice Choose reinforcement that is certified to a recognised sustainability certification scheme such as Eco-Reinforcement and CARES (UK Certification Authority for Reinforcing ...
» Read full articleFive reasons you should be using… networking website LinkedIn
01 Relationships matter We all know relationships matter when it comes to getting work. Research also supports this — in 2009 a study in the US showed that 89% of ...
» Read full articleGarry Winter’s Case notes: March 2012
Jerram Falkus Construction v Fenice Investments Technology and Construction Court, July 2011 Jerram was employed by Fenice under a JCT design and build contract to construct a development in Camden, ...
» Read full articleYou may love or hate social media, but you can’t ignore it
Social communication via the internet is here to stay, so get your policy in place sooner rather than later, advises Stephen Clarke For those of you who don’t have teenage ...
» Read full article (2 comments)Five things you should know about… getting more from the CDM coordinator
01 Why bother? Approximately 50% of all prosecutions under the Construction (Design and Management) Regulations 2007 (CDM) are against the client. For “notifiable” projects it is all too often for ...
» Read full article (1 comment)Tips of the Trade: Preparing for BIM
Preparing for BIM 01 Embrace the vision Build your understanding of how BIM projects will operate and how management of information may differ to traditional contracts. You will need as ...
» Read full article (1 comment)
Making the most of modern methods of communication
Good project management needs good communication. Steve Nicholls describes how social media applications can help Social Media tools are of increasing importance as firms and individuals work out how to ...
» Read full articleRichard Hildrick’s Case notes: Feb12
Leander Construction v Mullaley & Company Technology and Construction Court, 21 December 2011 Leander was the groundwork and concrete frame subcontractor on a residential project in the London Borough of ...
» Read full articleFirst the bad news: there’s no good news
If the Bank of England’s top dog can’t tell us where the economy is going, what chance do the rest of us have? asks Richard Kauntze Sir Mervyn King, the ...
» Read full articleFive ways to…improve the reliability of order book figures
01 Why does it matter? Forward order book figures are one of the key indices used to generate investor confidence in listed construction companies and our analysis of the order ...
» Read full articleTips of the Trade: Planting trees on urban projects
Planting trees on urban projects 01 Plan ahead Make sure your building design won’t clash with your landscaping design. Any basements, foundations, underground parking and utility layouts will need to ...
» Read full article
Is commercial property a Deal breaker?
Concerns have been voiced over how the much-vaunted Green Deal will stack up when it comes to commercial buildings. Denise Chevin reports Will the Green deal work for commercial property? ...
» Read full articleGet your head round mental health
Mental health is one of the biggest problems facing businesses today. Yet, as Jamie Patterson explains, the issues are often ignored. Mental health conditions were the most common cause of ...
» Read full articleFive things… you ought to know about energy consumption in the home
01 We spend more on electricity than gas We use three times as much gas as electricity — but electricity costs more than three times as much, so on average ...
» Read full article (1 comment)Garry Winter’s case notes
Thameside Construction Company v Arthenella Technology and Construction Court 20 October 2011. Thameside was employed by Arthenella to undertake the conversion of Frogmore Hall in Hertfordshire into residential units. The ...
» Read full article
Five ways to… survive the office Christmas party
01 Time your arrival You don’t want to be the first to turn up… or the last, so check you know the itinerary for the evening. Being “fashionably late” might give ...
» Read full article
When actions speak louder than words
Your attitude and the way you communicate on site will have more influence on health and safety outcomes than a rule book written in the office, argues Glen Robertson On ...
» Read full articlePeter Stockill’s Case notes
Witney Town Council v Beam Construction (Cheltenham) Technology and Construction Court 2011 If you start an adjudication, you naturally want to be confident that the decision will be enforced. Under ...
» Read full articleThe right to imply
Two recent cases show that goods and services should be fit for purpose, even where there is no contract, says James Mullen In July 2011 two judgments considered terms being ...
» Read full article
Out with the old...
Changes to the Building Regulations and Building Control are afoot. Paul Everall explains what they mean for construction firms. The next few months might be an interesting time for those ...
» Read full articleStephen Clarke's case notes
James Andrew Robinson v PE Jones Court of Appeal, January 2011 In December 1991 Mr Robinson agreed to buy a new-build house from PE Jones (Contractors) (“the contractor”). During construction ...
» Read full article (1 comment)Five words you’ve heard…but were afraid to ask what they meant
01 Annular nail A nail with ridges along its shaft that help hold it firmly in place and prevent the nail pulling out. Often used for fixing plywood and other similar ...
» Read full article
Temps have rights now too you know
The Agency Workers Regulations become law this year. Christopher Syder and James Pike explain what they mean for construction firms. As some construction businesses begin to see an upturn in demand, ...
» Read full article (1 comment)Garry Winter’s case notes
Inframatrix Investments v Dean Construction Technology and Construction Court, 25 July 2011 Inframatrix ("Infra") wanted to build a camera factory. Dean was the contractor for the cladding and roofing works. ...
» Read full article
Just when you thought you’d got to grips with the Construction Act...
Changes to the Construction Act are due to come into force later this year and, as Stephen Clarke explains, they should not be underestimated by any party to a contract ...
» Read full articleRichard Hildrick’s Case notes: July/August 2011
CRJ Services v Lanstar Technology and Construction Court, 19 April 2011 Lanstar was the operator of a waste management and recycling facility near Salisbury in Wiltshire. Since 2007 Lanstar had ...
» Read full articleIt’s localism, but not as we know it
New development to drive the economy is overshadowing localist agendas. But Joanne Cave argues there’s room for both As the Localism Bill makes its passage through Parliament, it has attracted ...
» Read full articleFive ways to… improve agency recruitment
...improve agency recruitment 01 Plan ahead Making an agency aware of your requirements several weeks in advance will allow it to find, interview and screen local candidates well in advance of ...
» Read full article
The disability that’s coming out of hiding
Thousands of employees could be suffering from dyslexia without knowing it. But the condition is now gaining more recognition. Denise Chevin reports. Simon Hodges left school at 16. He had ...
» Read full articleFive ways to… make the most of living walls
01 Don’t be put off by the challenges of the building Living walls can go anywhere, at any height, with any aspect or level of exposure — it’s all about ...
» Read full articleRob Horne’s Case notes: June 2011
Jones v Kaney Supreme Court 2011 Most of us would not give a second thought to the consequences of someone we had asked for advice giving that advice negligently. We would ...
» Read full articleFive ways to...
Five ways to… get your green mojo back... and keep it 01 Find someone to inspire you There are plenty of green superheroes out there. Anita Roddick, Bill McKibben, Paul Hawken, Ray ...
» Read full articleInsurance at a premium
Contractors will find bonds harder to come by and the cost of professional indemnity insurance is set to rise, report David Hayhow and Jake Tobin The construction market remains slow ...
» Read full articleRefurbishment did not create a new dwelling
Court rules that couple cannot claim for defective work under the Defective Premises Act. Ben Worthington explains Builders and design consultants involved in housebuilding or refurbishment works will be interested ...
» Read full articlePaul Lomas-Clarke’case notes
De Beers UK v Atos Origin IT Services UK Technology and Construction Court 2011 Construction contracts are awash with disputes about the responsibility for delays and liability for damages. The ...
» Read full article
Measuring up to the carbon challenge
Demonstrating your sustainable credentials is easier said than done, given the number of different standards out there. But there is an alternative, says Kye Gbangbola What’s the best approach for ...
» Read full article
Green Deal’s gender agenda
Meeting carbon targets will create openings ideally suited to women, says Niki Luscombe — as long as we can train them first “Transforming the built environment to low carbon could ...
» Read full articleRichard Hildrick’s Case notes: McCain Foods GB v Eco-Tec (Europe)
McCain Foods GB v Eco-Tec (Europe) Technology and Construction Court, January 2011 In 2008, McCain entered into a £263,500 contract with Eco-Tec, which was to provide a process engineering system ...
» Read full article (1 comment)
Why we specified... April 2011
Cast in situ concrete sawtooth roof by Shepherd Construction Loughborough University Design Centre Nicholas Burwell, partner, Burwell Deakins Architects The Loughborough University Design Centre is a £15M project to construct ...
» Read full article
Why we specified...Mar11
SolarTech Renewable Energy Solutions Code Level 6 homes at Mendip Place, Chelmsford Jason Page, assistant architect, Ingleton Wood Architects At Mendip Place, six houses and four flats for local housing ...
» Read full articleGarry Winter’s Case notes – Co-operative Group v John Allen Associates
Technology and Construction Court 2010 John Allen Associates (JAA) was a consulting engineer which, while employed initially by developers, had also provided a warranty to the overall client, the Co-operative ...
» Read full articleKeeping BIM on the right side of the law
The adoption of multi-party BIM models will need careful legal underpinning. CM asked law firms Brodies and Fenwick Elliott for their views Does sharing data mean sharing liability? BIM carries on ...
» Read full articleEnvironmental markets: more detail on Defra's plans
ONLINE ONLY Bio-diversity offsetting looks like it could be arriving in the UK, following the trend in many countries to use “environmental markets” to protect natural habitats. In 2008 in the United States, conservation credits from developers raised over $3bn for wetland conservation.
» Read full article
Will pricing our wildlife ease planning pain?
The government has drawn up a proposal to let developers buy their way out of on-site biodiversity measures. Denise Chevin reports
» Read full article (1 comment)Richard Hildrick’s Case notes: February '11
Straw Realisations, formerly known as Haymills (Contractors) (in administration) v Shaftsbury House (Developments) Technology and Construction Court, October 2010 Haymills was the contractor for an £8.5m mixed-use development in Islington, ...
» Read full articleLegal update: Localism Bill explained
ONLINE ONLY By Michael Hardware of Chelgate, public relations and public affairs consultants Following much speculation as to its content, the Decentralisation and Localism Bill was finally introduced to the House of ...
» Read full articleAlisdair Matheson's Case notes: Jan '11
Dhamija & another v Sunningdale Joineries & others Technology and Construction Court, October 2010 In 2009 Mr and Mrs Dhamija pursued their contractor Sunningdale Joineries, along with their architects and ...
» Read full article (1 comment)Peter Jacobs: And about time too
Peter Jacobs, CIOB vice-president, and until recently delivery director at the 2012 Olympic Village, reviews the CIOB’s new protocol on time management. Keith Pickavance is a recent Past President of ...
» Read full article (1 comment)
Specialist cover that could be a life saver
An insurance policy that acts as an alternative to subcontractor bonds has proved popular in the US and could take off here. Elaine Knutt reports For main contractors reading the ...
» Read full article (1 comment)A tough examination
This month, two readers are concerned about the tough jobs market, despite studying to improve their chances. Our Career Consultants offer their tips. Q I am a part-time HNC Construction ...
» Read full article (3 comments)Richard Hildrick's Case notes: Nov/Dec10
How Engineering Services v Southern Insulation (Medway) Technology and Construction Court, July 2010 How Engineering was the M&E subcontractor to Sir Robert McAlpine on the development of an office building in ...
» Read full articleGarry Winter’s Case notes
Traditional Structures v H W Construction Technology and Construction Court, May 2010 H W Construction was tendering as main contractor for a business development centre. Part of the project required ...
» Read full article (1 comment)
‘Green’ clauses — the new ties that bind
As energy targets become linked to clients’ cold, hard cash, there’s a risk that new areas of loss and litigation could open up, warns Brad Fearn In our recent survey ...
» Read full articleRichard Hildrick’s Case notes
Case notes Case: WW Gear Construction v McGee Group Technology and Construction Court June 2010 WW Gear was the developer and employer for the Westminster Plaza Hotel in London. McGee ...
» Read full article (2 comments)
There’s a cloud coming your way
Outsourcing software and computer services is increasingly being seen as a cost-effective and sustainable IT option. Graham McLean advises Cloud computing is causing major shifts in the IT industry, and ...
» Read full articleCareer Consultant: What price experience?
Advice for an experienced manager who has found that a post-graduate qualification hasn’t boosted his prospects Q. I have been working in the construction industry for more than 30 years, ...
» Read full article (3 comments)Ann Wright: Computer calamity
Ann Wright’s Case notes Computer calamity Case: Kingsway Hall Hotel v Red Sky (Hounslow). Technology and Construction Court May 2010 In 2006 the Kingsway Hall Hotel paid £49,999 plus an ...
» Read full article (1 comment)Ann Wright: Summary execution
Case: Clancy Consulting v Derwent Holdings, Anglo International Holdings, Mardown, Cashtal Properties, Mount Murray Country Club and Cashtal Developments. Technology and Construction Court March 2010. The defendants were separate companies, ...
» Read full articleDo project managers make good business leaders?
A seat on the board requires different skills from project management, says Mace’s Brian Moone Excel long enough as a project manager and you may be invited to join the ...
» Read full articleAnn Wright: Insolvency isn’t always a get-out
Case: Selby Hall & Philip Shivers v Jan Van Der Heiden Technology and Construction Court, March 2010 It was a simple £143,000 flat refurb. Ms Hall and Mr Shivers hired ...
» Read full articleBaby on board
CM readers know how to manage projects, but managing your career can be a lot trickier. So we’ve assembled our panel of experienced Career Consultants to offer a fresh perspective. ...
» Read full article (2 comments)
Learning the lessons on green education
Institutions are only gradually addressing the gap in sustainable learning. Katie Puckett reports Buildings are getting more complex, regulations are tighter, and it’s increasingly down to the contractor to deliver a ...
» Read full article (6 comments)To avoid legal claims and lost tenders – read on
Under the Equality Bill, it’s time to even up pay and opportunity for everyone, writes Sharon Latham In its manifesto ahead of the 2005 general election, the Labour Party committed ...
» Read full articleAnn Wright: Questions of probability
Case: Speymill Contracts v Eric Baskind Court of Appeal February 2010 Raby House in Cheshire used to be a hotel. Sometime before 2005, it was bought by a Mr Baskind to ...
» Read full article
Get ready for next round in contractual paper chase
The new Construction Act may be on hold, but Hamish Lal says it cannot be ignored. What is the new Construction Act? When does it take effect? How will it ...
» Read full article (2 comments)The time is ripe for a new approach to insurance
At present, many contractors purchase a standard package of insurance products, regardless of the type, size, location and duration of the project. Often there are overlaps and inefficiencies with this ...
» Read full articleAnn Wright: A step in the wrong direction
Case: Thomas Henry Jose and MacSalvors Plant Hire Ltd v Brush Transformers Ltd. Court of Appeal 15 December 2009 Mr Jose, a competent and experienced crane driver, worked for plant ...
» Read full article (1 comment)
Clampdown on the framework fiddlers
New regulations have been introduced to give contractors more remedies to deal with uncompetitive practices. Peter Gracia reports After the Office of Fair Trading revelations last year that price fixing ...
» Read full articleAnn Wright: Called to account
Jim Ennis Construction Ltd v Combined Stabilisation Ltd TCC 20 November 2009 From 2008, CSL carried out groundworks for JEC at Bovis Lend Lease’s site at Unity College, Burnley. CSL’s ...
» Read full articleLegal: Blowing the whistle on construction disputes
Legal advisers suggest a range of tactics contractors can deploy to avoid or defuse disputes Many CM readers will probably have experienced the horrors of a construction dispute – if not first-hand, they’re ...
» Read full article (1 comment)