Management
Out with the old...
Tearing up the Building Regs shouldn't be this hard
Changes to the Building Regulations and Building Control are afoot.
Paul Everall explains what they mean for construction firms.
The next few months might be an interesting time for those who work in Building Control departments in England and Wales, and for all those regulated by them. First of all, the government has announced its intention to launch a new “red tape challenge” on construction, to see what regulations might be removed or which might have their effect diminished.
More specifically, a consultation paper is set to be issued in December covering not only further proposed amendments to the Building Regulations themselves, but also changes to the Building Control system. What can we hope or expect to see in this paper?
It needs to be remembered that the primary duty of compliance with Building Regulations rests not with the Building Control surveyor, but with those responsible for carrying out the building work — the client, architect and contractor.
The construction manager has an important role to play in ensuring compliance, and therefore needs to be fully aware of the requirements of the regulations. They need to be constantly on the lookout for where deviations might be occurring, and as we move closer towards zero carbon it will be particularly important that one product is not substituted for another without assessing the effect on compliance. There is concern that as-built performance can be significantly worse than the designer intended, partly because of the substitution of inferior materials.
With regard to possible changes to Building Regulations affecting England (the Welsh Assembly Government takes responsibility for Building Regulations in the Principality from 31 December 2011) I anticipate that these might include:
- Further strengthening of Part L (Conservation of Fuel and Power) as part of the journey to zero carbon for new homes from 2016 and other buildings from 2019;
- Recognition within Part A (Structure) of the increasing role of structural Eurocodes;
- Changes to the scope of Part P (Electrical safety) recognising the government’s concerns that it is currently over-burdensome in relation to the benefits it brings;
- Some changes to Part M (Access to and use of buildings) to clarify the use of access statements; and
- Some rationalisation of Parts M, K (Protection from falling, collision and impact) and N (Glazing).
To assist in the first of these, early in 2011 the Department for Communities and Local Government (DCLG) established four working groups under the Building Regulations Advisory Committee (BRAC) to consider what might sensibly be done in 2013 and what might be left to 2016. These groups covered domestic new-build, non-domestic new build, compliance and improvements to the existing stock.
The latter group also looked at the interaction with the Green Deal, the government’s ambitious policy to enable energy efficiency improvements to be carried out to homes and other buildings at no up-front cost, and which is due to come into effect in October 2012.
Turning to improvements to the existing Building Control system, it seems likely that the government will want to ensure current best practice by Building Control bodies is required from all. Risk-based assessment will become the norm, so that developers will agree a service plan with Building Control before work starts and scarce inspection resources will be aimed at those builders seen as less likely to comply and at those times when serious breaches of Building Regulations are most likely to be evident. The outdated system of statutory notifications is likely to be scrapped — except at commencement and completion of the work — and the issue of completion certificates made mandatory.
There is also likely to be continued emphasis on ensuring compliance. LABC believes that the best way of achieving this is by the Building Control surveyor working closely with the architect and builder to identify issues on the plans as submitted and discussing issues as they arise on site.
However, there will always be a few who are determined to flout the law, and at present the enforcement powers available to local authorities are somewhat limited, and may lead to clients being prosecuted and the work not put right. We are hopeful, therefore, that the government might consult on giving councils additional powers such as being able to issue stop notices when serious breaches are spotted and to issue on-the-spot fines, which might concentrate the minds of some persistent offenders.
One measure LABC would like to see is some restriction on the use of building notices (where no plans are submitted in advance of work starting), but this may not be proposed by the government.
Challenging times may lie ahead. I hope that you individually, and the CIOB collectively, will work with LABC to improve both the Building Control system and the Building Regulations to ensure they are fit for purpose.
Paul Everall is chief executive of the LABC
Leave a comment
Construction Pro
Peter Stockill’s Case notes
Sweett (UK) (formerly Cyril Sweett) v Michael Wight Homes CC, February 2012 If you agree to arrange for a contract to be put in place between two other parties, are ...
» Read full articleWho wants to be a director?
To be on the board of a company has its attractions, but it also carries a wide range of legal responsibilities, says Christopher Burgon Whether you are at the apex ...
» Read full articleFive ways to… manage an age-diverse workforce
Five ways to... manage an age-diverse workforce 01 Address the myths Stereotypical thinking about age and what people can or can’t do influences the way people at work are managed ...
» Read full articleTips of the Trade
Energy-harvesting wireless sensor networks 01 Understand the basics Energy-harvesting wireless sensors use micro-energy convertors — in the form of motion converters, solar cells or temperature convertors — to power sensors, ...
» Read full article
Why we specified...
Ecodan CAHV monobloc air source heat pump boilers from Mitsubishi Electric Spring Gardens, Lewisham Simon Moses, asset manager, St Mungo’s Housing Association We’d received funding from the Homes and Community ...
» Read full article
Have you thought of…
...working on a $100bn metropolis built on a series of artificial islands? Forget Palm Island, it’s so last decade. The latest artificial island for Premiership football players to grab a ...
» Read full articleStephen Clarke’s Case notes: April 2012
Stephen Clarke’s Case notes Ms S Jones and Ms R Lovegrove v Mr L Ruth and Mrs K Ruth Court of Appeal 12 July 2011 Ms Jones and Ms Lovegrove ...
» Read full article (1 comment)Salary exchange schemes can bring all-round benefits
Salary exchange schemes can bring all-round benefits The NIC exemption for holiday pay schemes is being removed. But there’s other options to structure pay tax efficiently, says Anil Patel The ...
» Read full articleTips of the Trade: Working with concrete reinforcement
Working with concrete reinforcement 01 Make the right choice Choose reinforcement that is certified to a recognised sustainability certification scheme such as Eco-Reinforcement and CARES (UK Certification Authority for Reinforcing ...
» Read full articleFive reasons you should be using… networking website LinkedIn
01 Relationships matter We all know relationships matter when it comes to getting work. Research also supports this — in 2009 a study in the US showed that 89% of ...
» Read full articleGarry Winter’s Case notes: March 2012
Jerram Falkus Construction v Fenice Investments Technology and Construction Court, July 2011 Jerram was employed by Fenice under a JCT design and build contract to construct a development in Camden, ...
» Read full articleYou may love or hate social media, but you can’t ignore it
Social communication via the internet is here to stay, so get your policy in place sooner rather than later, advises Stephen Clarke For those of you who don’t have teenage ...
» Read full article (2 comments)Five things you should know about… getting more from the CDM coordinator
01 Why bother? Approximately 50% of all prosecutions under the Construction (Design and Management) Regulations 2007 (CDM) are against the client. For “notifiable” projects it is all too often for ...
» Read full article (1 comment)Tips of the Trade: Preparing for BIM
Preparing for BIM 01 Embrace the vision Build your understanding of how BIM projects will operate and how management of information may differ to traditional contracts. You will need as ...
» Read full article (1 comment)
Making the most of modern methods of communication
Good project management needs good communication. Steve Nicholls describes how social media applications can help Social Media tools are of increasing importance as firms and individuals work out how to ...
» Read full articleRichard Hildrick’s Case notes: Feb12
Leander Construction v Mullaley & Company Technology and Construction Court, 21 December 2011 Leander was the groundwork and concrete frame subcontractor on a residential project in the London Borough of ...
» Read full articleFirst the bad news: there’s no good news
If the Bank of England’s top dog can’t tell us where the economy is going, what chance do the rest of us have? asks Richard Kauntze Sir Mervyn King, the ...
» Read full articleFive ways to…improve the reliability of order book figures
01 Why does it matter? Forward order book figures are one of the key indices used to generate investor confidence in listed construction companies and our analysis of the order ...
» Read full articleTips of the Trade: Planting trees on urban projects
Planting trees on urban projects 01 Plan ahead Make sure your building design won’t clash with your landscaping design. Any basements, foundations, underground parking and utility layouts will need to ...
» Read full article
Is commercial property a Deal breaker?
Concerns have been voiced over how the much-vaunted Green Deal will stack up when it comes to commercial buildings. Denise Chevin reports Will the Green deal work for commercial property? ...
» Read full articleGet your head round mental health
Mental health is one of the biggest problems facing businesses today. Yet, as Jamie Patterson explains, the issues are often ignored. Mental health conditions were the most common cause of ...
» Read full articleFive things… you ought to know about energy consumption in the home
01 We spend more on electricity than gas We use three times as much gas as electricity — but electricity costs more than three times as much, so on average ...
» Read full article (1 comment)Garry Winter’s case notes
Thameside Construction Company v Arthenella Technology and Construction Court 20 October 2011. Thameside was employed by Arthenella to undertake the conversion of Frogmore Hall in Hertfordshire into residential units. The ...
» Read full article
Five ways to… survive the office Christmas party
01 Time your arrival You don’t want to be the first to turn up… or the last, so check you know the itinerary for the evening. Being “fashionably late” might give ...
» Read full article
When actions speak louder than words
Your attitude and the way you communicate on site will have more influence on health and safety outcomes than a rule book written in the office, argues Glen Robertson On ...
» Read full articlePeter Stockill’s Case notes
Witney Town Council v Beam Construction (Cheltenham) Technology and Construction Court 2011 If you start an adjudication, you naturally want to be confident that the decision will be enforced. Under ...
» Read full articleThe right to imply
Two recent cases show that goods and services should be fit for purpose, even where there is no contract, says James Mullen In July 2011 two judgments considered terms being ...
» Read full article
Out with the old...
Changes to the Building Regulations and Building Control are afoot. Paul Everall explains what they mean for construction firms. The next few months might be an interesting time for those ...
» Read full articleStephen Clarke's case notes
James Andrew Robinson v PE Jones Court of Appeal, January 2011 In December 1991 Mr Robinson agreed to buy a new-build house from PE Jones (Contractors) (“the contractor”). During construction ...
» Read full article (1 comment)Five words you’ve heard…but were afraid to ask what they meant
01 Annular nail A nail with ridges along its shaft that help hold it firmly in place and prevent the nail pulling out. Often used for fixing plywood and other similar ...
» Read full article
Temps have rights now too you know
The Agency Workers Regulations become law this year. Christopher Syder and James Pike explain what they mean for construction firms. As some construction businesses begin to see an upturn in demand, ...
» Read full article (1 comment)Garry Winter’s case notes
Inframatrix Investments v Dean Construction Technology and Construction Court, 25 July 2011 Inframatrix ("Infra") wanted to build a camera factory. Dean was the contractor for the cladding and roofing works. ...
» Read full article
Just when you thought you’d got to grips with the Construction Act...
Changes to the Construction Act are due to come into force later this year and, as Stephen Clarke explains, they should not be underestimated by any party to a contract ...
» Read full articleRichard Hildrick’s Case notes: July/August 2011
CRJ Services v Lanstar Technology and Construction Court, 19 April 2011 Lanstar was the operator of a waste management and recycling facility near Salisbury in Wiltshire. Since 2007 Lanstar had ...
» Read full articleIt’s localism, but not as we know it
New development to drive the economy is overshadowing localist agendas. But Joanne Cave argues there’s room for both As the Localism Bill makes its passage through Parliament, it has attracted ...
» Read full articleFive ways to… improve agency recruitment
...improve agency recruitment 01 Plan ahead Making an agency aware of your requirements several weeks in advance will allow it to find, interview and screen local candidates well in advance of ...
» Read full article
The disability that’s coming out of hiding
Thousands of employees could be suffering from dyslexia without knowing it. But the condition is now gaining more recognition. Denise Chevin reports. Simon Hodges left school at 16. He had ...
» Read full articleFive ways to… make the most of living walls
01 Don’t be put off by the challenges of the building Living walls can go anywhere, at any height, with any aspect or level of exposure — it’s all about ...
» Read full articleRob Horne’s Case notes: June 2011
Jones v Kaney Supreme Court 2011 Most of us would not give a second thought to the consequences of someone we had asked for advice giving that advice negligently. We would ...
» Read full articleFive ways to...
Five ways to… get your green mojo back... and keep it 01 Find someone to inspire you There are plenty of green superheroes out there. Anita Roddick, Bill McKibben, Paul Hawken, Ray ...
» Read full articleInsurance at a premium
Contractors will find bonds harder to come by and the cost of professional indemnity insurance is set to rise, report David Hayhow and Jake Tobin The construction market remains slow ...
» Read full articleRefurbishment did not create a new dwelling
Court rules that couple cannot claim for defective work under the Defective Premises Act. Ben Worthington explains Builders and design consultants involved in housebuilding or refurbishment works will be interested ...
» Read full articlePaul Lomas-Clarke’case notes
De Beers UK v Atos Origin IT Services UK Technology and Construction Court 2011 Construction contracts are awash with disputes about the responsibility for delays and liability for damages. The ...
» Read full article
Measuring up to the carbon challenge
Demonstrating your sustainable credentials is easier said than done, given the number of different standards out there. But there is an alternative, says Kye Gbangbola What’s the best approach for ...
» Read full article
Green Deal’s gender agenda
Meeting carbon targets will create openings ideally suited to women, says Niki Luscombe — as long as we can train them first “Transforming the built environment to low carbon could ...
» Read full articleRichard Hildrick’s Case notes: McCain Foods GB v Eco-Tec (Europe)
McCain Foods GB v Eco-Tec (Europe) Technology and Construction Court, January 2011 In 2008, McCain entered into a £263,500 contract with Eco-Tec, which was to provide a process engineering system ...
» Read full article (1 comment)
Why we specified... April 2011
Cast in situ concrete sawtooth roof by Shepherd Construction Loughborough University Design Centre Nicholas Burwell, partner, Burwell Deakins Architects The Loughborough University Design Centre is a £15M project to construct ...
» Read full article
Why we specified...Mar11
SolarTech Renewable Energy Solutions Code Level 6 homes at Mendip Place, Chelmsford Jason Page, assistant architect, Ingleton Wood Architects At Mendip Place, six houses and four flats for local housing ...
» Read full articleGarry Winter’s Case notes – Co-operative Group v John Allen Associates
Technology and Construction Court 2010 John Allen Associates (JAA) was a consulting engineer which, while employed initially by developers, had also provided a warranty to the overall client, the Co-operative ...
» Read full articleKeeping BIM on the right side of the law
The adoption of multi-party BIM models will need careful legal underpinning. CM asked law firms Brodies and Fenwick Elliott for their views Does sharing data mean sharing liability? BIM carries on ...
» Read full articleEnvironmental markets: more detail on Defra's plans
ONLINE ONLY Bio-diversity offsetting looks like it could be arriving in the UK, following the trend in many countries to use “environmental markets” to protect natural habitats. In 2008 in the United States, conservation credits from developers raised over $3bn for wetland conservation.
» Read full article
Will pricing our wildlife ease planning pain?
The government has drawn up a proposal to let developers buy their way out of on-site biodiversity measures. Denise Chevin reports
» Read full article (1 comment)Richard Hildrick’s Case notes: February '11
Straw Realisations, formerly known as Haymills (Contractors) (in administration) v Shaftsbury House (Developments) Technology and Construction Court, October 2010 Haymills was the contractor for an £8.5m mixed-use development in Islington, ...
» Read full articleLegal update: Localism Bill explained
ONLINE ONLY By Michael Hardware of Chelgate, public relations and public affairs consultants Following much speculation as to its content, the Decentralisation and Localism Bill was finally introduced to the House of ...
» Read full articleAlisdair Matheson's Case notes: Jan '11
Dhamija & another v Sunningdale Joineries & others Technology and Construction Court, October 2010 In 2009 Mr and Mrs Dhamija pursued their contractor Sunningdale Joineries, along with their architects and ...
» Read full article (1 comment)Peter Jacobs: And about time too
Peter Jacobs, CIOB vice-president, and until recently delivery director at the 2012 Olympic Village, reviews the CIOB’s new protocol on time management. Keith Pickavance is a recent Past President of ...
» Read full article (1 comment)
Specialist cover that could be a life saver
An insurance policy that acts as an alternative to subcontractor bonds has proved popular in the US and could take off here. Elaine Knutt reports For main contractors reading the ...
» Read full article (1 comment)A tough examination
This month, two readers are concerned about the tough jobs market, despite studying to improve their chances. Our Career Consultants offer their tips. Q I am a part-time HNC Construction ...
» Read full article (3 comments)Richard Hildrick's Case notes: Nov/Dec10
How Engineering Services v Southern Insulation (Medway) Technology and Construction Court, July 2010 How Engineering was the M&E subcontractor to Sir Robert McAlpine on the development of an office building in ...
» Read full articleGarry Winter’s Case notes
Traditional Structures v H W Construction Technology and Construction Court, May 2010 H W Construction was tendering as main contractor for a business development centre. Part of the project required ...
» Read full article (1 comment)
‘Green’ clauses — the new ties that bind
As energy targets become linked to clients’ cold, hard cash, there’s a risk that new areas of loss and litigation could open up, warns Brad Fearn In our recent survey ...
» Read full articleRichard Hildrick’s Case notes
Case notes Case: WW Gear Construction v McGee Group Technology and Construction Court June 2010 WW Gear was the developer and employer for the Westminster Plaza Hotel in London. McGee ...
» Read full article (2 comments)
There’s a cloud coming your way
Outsourcing software and computer services is increasingly being seen as a cost-effective and sustainable IT option. Graham McLean advises Cloud computing is causing major shifts in the IT industry, and ...
» Read full articleCareer Consultant: What price experience?
Advice for an experienced manager who has found that a post-graduate qualification hasn’t boosted his prospects Q. I have been working in the construction industry for more than 30 years, ...
» Read full article (3 comments)Ann Wright: Computer calamity
Ann Wright’s Case notes Computer calamity Case: Kingsway Hall Hotel v Red Sky (Hounslow). Technology and Construction Court May 2010 In 2006 the Kingsway Hall Hotel paid £49,999 plus an ...
» Read full article (1 comment)Ann Wright: Summary execution
Case: Clancy Consulting v Derwent Holdings, Anglo International Holdings, Mardown, Cashtal Properties, Mount Murray Country Club and Cashtal Developments. Technology and Construction Court March 2010. The defendants were separate companies, ...
» Read full articleDo project managers make good business leaders?
A seat on the board requires different skills from project management, says Mace’s Brian Moone Excel long enough as a project manager and you may be invited to join the ...
» Read full articleAnn Wright: Insolvency isn’t always a get-out
Case: Selby Hall & Philip Shivers v Jan Van Der Heiden Technology and Construction Court, March 2010 It was a simple £143,000 flat refurb. Ms Hall and Mr Shivers hired ...
» Read full articleBaby on board
CM readers know how to manage projects, but managing your career can be a lot trickier. So we’ve assembled our panel of experienced Career Consultants to offer a fresh perspective. ...
» Read full article (2 comments)
Learning the lessons on green education
Institutions are only gradually addressing the gap in sustainable learning. Katie Puckett reports Buildings are getting more complex, regulations are tighter, and it’s increasingly down to the contractor to deliver a ...
» Read full article (6 comments)To avoid legal claims and lost tenders – read on
Under the Equality Bill, it’s time to even up pay and opportunity for everyone, writes Sharon Latham In its manifesto ahead of the 2005 general election, the Labour Party committed ...
» Read full articleAnn Wright: Questions of probability
Case: Speymill Contracts v Eric Baskind Court of Appeal February 2010 Raby House in Cheshire used to be a hotel. Sometime before 2005, it was bought by a Mr Baskind to ...
» Read full article
Get ready for next round in contractual paper chase
The new Construction Act may be on hold, but Hamish Lal says it cannot be ignored. What is the new Construction Act? When does it take effect? How will it ...
» Read full article (2 comments)The time is ripe for a new approach to insurance
At present, many contractors purchase a standard package of insurance products, regardless of the type, size, location and duration of the project. Often there are overlaps and inefficiencies with this ...
» Read full articleAnn Wright: A step in the wrong direction
Case: Thomas Henry Jose and MacSalvors Plant Hire Ltd v Brush Transformers Ltd. Court of Appeal 15 December 2009 Mr Jose, a competent and experienced crane driver, worked for plant ...
» Read full article (1 comment)
Clampdown on the framework fiddlers
New regulations have been introduced to give contractors more remedies to deal with uncompetitive practices. Peter Gracia reports After the Office of Fair Trading revelations last year that price fixing ...
» Read full articleAnn Wright: Called to account
Jim Ennis Construction Ltd v Combined Stabilisation Ltd TCC 20 November 2009 From 2008, CSL carried out groundworks for JEC at Bovis Lend Lease’s site at Unity College, Burnley. CSL’s ...
» Read full articleLegal: Blowing the whistle on construction disputes
Legal advisers suggest a range of tactics contractors can deploy to avoid or defuse disputes Many CM readers will probably have experienced the horrors of a construction dispute – if not first-hand, they’re ...
» Read full article (1 comment)


